Red Deer River — Dickson TailwatersFishing Report — May 2026
Zone PP2Special WatersRed Deer River at Dickson Dam tunnel outlet. Cold tailwater below Gleniffer — rainbows and browns year-round.
Current Conditions — Is Red Deer River clear to fish today?
Good conditions — reliable option
Flows are about normal for this time of year. This type of water often fishes well when nearby freestone rivers are high or muddy.
Comfortable wading range for this type of water.
Discharge
17.1
m³/s
Level
1.33
metres
Station
DICKSON DAM TUNNEL OUTLET
Gauge reading · 3h ago
Hatch Charts — May 2026
Local Weather
Red Deer River — Dickson Tailwaters
Mainly Clear
Low near 12°C, high near 26°C. Wind 10 km/h NW (gusts ~27) morning → 11 km/h N (gusts ~32) afternoon → 7 km/h SE (gusts ~22) evening. Precipitation ~1.3 mm for the day.
Feels like
25°C
6 AM
12°
9 km/h NW
12 PM
22°
13 km/h NW
6 PM
26°
6 km/h NNE
9 PM
21°
11 km/h SE
Wind (now)
10 km/h NNE · gusts 30
Humidity
40%
UV Index
6
Sportfishing Regulations
Zone boundaries and Special Waters designations from Alberta Fish & Wildlife GIS (updated 2026-05-20). Bag limits, seasons, and gear rules are only on the official guide — verify before you fish.
Watershed unit (sportfishing zone)
Central parkland including Edmonton-area rivers and pothole lakes.
Open PP2 regulations on albertaregulations.caFish management zone (FMZ)
Parkland-Prairie Zone
Broad provincial zone — detailed limits are set per watershed unit above.
Alberta Special Waters (RL-PAAS)
This waterbody appears in the provincial Special Waters inventory. Extra rules (bait bans, size limits, seasonal closures, etc.) may apply — read the official zone guide and any waterbody-specific schedules.
- RED DEER RIVER · Rocky Mountain House district
Fisheries survey species: BRST, Black Bullhead, Brook Trout, Brown Trout, Bull Trout, Burbot (+35 more) (inventory data — not a limit table)
Catch-and-release sections — check dam release schedules before wading.
Current guide season: April 1, 2026 – March 31, 2027.
Notes
Dam-controlled — sudden flow changes possible.

